The Northumberland Line reopening, and particularly the new A1061 bridge replacing the level crossing at Newsham has sparked a lot of side conversation around the ‘Blyth Relief Road‘, which now centres around the proposal for 4.5km (2.8mi) dualling of the A1061 from the A189 ‘Three Horse Shoes’ to South Beach which skirts the southern edgeContinue reading “Port of Blyth: Time for a Tunnel?”